6 Star Energy Ratings and Artificial Lighting Requirements
Written by Nathan Peart
Mayrn1st 2012 is when the minimum star rating required for residentialrnprojects will be increased to 6 stars.
Therernhas been a lot of work going into investigating the effects this willrnhave on the building industry ,to ensure the changes required tornbuilding processes can be met without disruption or excessive cost.
Howeverrnthere is more to complying with the new energy efficiency regulationsrnthan just getting a 6 star rating from the HousernEnergy Rating Software. ThernBCA has included other clauses which must be complied with,rnin addition to the assessment performed by your energy ratingrnassessor.
In this article we will look atrncomplying with the Artificial Lighting regulation - BCA Vol 2rn3.12.5.5
In essence this regulation statesrnthat there is a maximum amount of lighting allowed for any specificrnarea.
Maximum Lighting Allowances
The maximum wattage allowed forrneach area are:
5W/m² in a Class 1 Building
4W/m² on a verandah orrnbalcony attached to a class 1 building
3W/m² in a class 10 Building.
Example:
Arearn Name | Area(m²) | Maximumrn Wattage | Totalrn Wattage |
Mainrn House | 190 | 5 | 950rn Watts |
Alfresco | 25 | 4 | 100rn Watts |
Balcony | 5 | 4 | 20rn Watts |
Garage | 36 | 3 | 108rn Watts |
These totals are not able to bernaveraged over the house. So if you took a 50w light fitting you wouldrnonly be able to have 19 fittings for inside the house. 2 Fittings forrnthe Alfresco, 2 for the garage and a single 20w fitting for thernBalcony.
Advice is still being sought fromrnThe Building Commission to clarify that the wattage of the globe canrnbe used as opposed to the maximum rating of the fitting.
When an EnergyrnRating is done for you ensure the lighting calculations arernincluded in the process.
This can be done by providing yournwith a compliance report that nominates the maximum wattage allowablernand removes the need to provide an electrical plan which may vary.rnThis compliance report can be carried through to Pre-start meetingsrnwith a calculation section included to ensure that the maximums arernnot exceeded during the selection process.
Thernnew 6 star energy rating regulations will mean a change to the wayrnbuilders, architects and building designers conduct their business.rnTo ensure a smooth transition, the integration of energy ratings intornyour system needs to be thought out before it is mandatory.
Tornhelp you do that, make sure you are in contact with a competentrnenergy rating assessor to help you with your approval process.
Article author
About the Author
Further reading
Further Reading
Article
Solar Contract Cancellation: Common Reasons Customers Change Their Minds
Homeowners cancel solar contracts due to misleading sales pitches, high pressure tactics, roof issues, financing problems, HOA rules, or life changes. Cooling off periods offer protection. Always read contracts carefully and act fast if doubts arise.
September 30, 2026
Article
How Handloom Bedsheets Are Made: From Raw Cotton to Your Bed
Learn how handloom cotton bedsheets are made, what affects their texture and price, and what to ask sellers when checking weaving methods and product details.
September 18, 2026
Article
Large Skip Bins Darwin: When Do You Need a 6m³ or 8m³ Bin?
Choosing the right skip bin size can make waste removal easier and more cost-effective, especially for large residential and commercial projects in Darwin.
September 17, 2026
Article
The Difference Between a Simple Fix and a Full Replacement
Deciphering whether a malfunctioning appliance needs a quick fix or a complete replacement can impact both your wallet and your daily routine. Understanding the distinction between the two can save you time, stress, and money, ensuring your household continues to run smoothly. Embracing the Efficiency of Appliance Repair in Orange County Repairing an appliance often emerges as the first line of defense against appliance failure. Opting for a repair, especially when handled by
March 4, 2026