ICD-10 Implementation: An update for physicians and coders
Written by Prerna Gupta
The transition to ICD-10 is much more than a mere increase in codes and field sizes. The descriptions of diagnosis codes in ICD-10 may be very different to what coders are used to seeing and using in ICD-9. Therefore, the complexity in transition is significant and shouldn’t be avoided by medical coders.
An easier and successful transition before October 1, 2013 would require a well planned and efficiently managed implementation process. Although the ICD-10-CM/PCS implementation deadline is two years away, good training plans will ensure a smooth transition for physicians, inpatient and outpatient coders.
Browse All: Medical Billing (http://www.medicalbillersandcoders.com/)
Impacting Inpatient Coders:
The ICD-10-CM/PCS final rule estimates that inpatient coders will need 50 hours of training. In order to ensure a successful transition, inpatient coders must:
• Possess sufficient foundational knowledge of the biomedical sciences (e.g., anatomy, physiology, patho physiology, pharmacology, and medical terminology)
• Learn how to apply ICD-10-CM/PCS codes correctly on inpatient encounters
• Understand how to apply maps and crosswalks betwee
ICD-9-CM and ICD-10-CM/PCS
Impacting Outpatient coders:
Outpatient coders would require approximately 16 hours of effective training in ICD-10-CM/PCS, presuming that coders already has the necessary knowledge in biomedical sciences. Other requirements are same as inpatient coders.
Medical coders need to adhere to the stipulated timeline for the various steps of ICD-9 to ICD-10 transition. Though the first phase is already over, the coders can still take assistance from various online resources and webinars conducted by AMA, AAPC, AAHIMA, and many other associations to get the requisite training and prepare for the transition process. Proper training and guidance in using use ICD- 10 will help coders to remain abreast with the changing industry norms and play a vital role in the implementation process for their employers and clients.
Physicians should keep track of the envisaged timeline for implementation of ICD-10 and prepare their clinic for smooth transition through its various phases:
Phase 1: Implementation plan development and impact assessment (first quarter 2009 to second quarter 2011)
Phase 2: Implementation preparation (first quarter 2011 to second quarter 2013)
Phase 3: “Go live” preparation (first quarter 2013 to third quarter 2013)
Phase 4: follow-up post-implementation (fourth quarter 2013 to fourth quarter 2014)
Physicians should also ensure training for in-house coders, or hire coders trained in using ICD-10, as proper coding is required to keep their revenue cycle efficient and optimized. For physician practices or hospitals facing problems in getting their staff upgraded, outsourcing might be a feasible option.
For More information visit: Charlotte,NC Medical Billing (http://www.medicalbillersandcoders.com/city/charlotte-northcarolina-medical-billing-specialist.html), Cleveland,OH Medical Billing (http://www.medicalbillersandcoders.com/city/cleveland-ohio-medical-billing-specialist.html)
Article author
About the Author
Medicalbillersandcoders.com is the largest consortium of Medical Billers and Coders in the United States. We offer Medical Billing, Charlotte,NC Medical Billing, Cleveland,OH Medical Billing
Further reading
Further Reading
Article
How ERP Software Connects E-commerce and Omnichannel Retail Operations
Learn how ERP software helps e-commerce businesses connect inventory, orders, sales channels, and business operations. Explore practical ways to improve order management, maintain accurate stock records, and create a more consistent customer experience across online and offline retail channels.
September 30, 2026
Article
Nonprofit Consultants: Building a Successful Client//Consultant Relationship
How to establish and maintain a strong client/consultant relationship with your clients
September 28, 2026
Article
The Rise of Two-Person Delivery: Why Bulky Goods Need a Smarter Approach
This article explains why bulky goods need specialist handling, reliable planning and clear customer communication, and how two-person delivery can support a better customer experience.
September 18, 2026
Article
Vacuum Formed Packaging Parts Manufacturer for Industrial Packaging Solutions
Insulink is a trusted vacuum formed packaging parts Manufacturer providing customized trays, inserts, holders, and protective packaging solutions for automotive, electronics, engineering, and industrial components. Contact: +91 9205274027 | www.insulink.co.in
September 17, 2026